electricpete
The motor in quesiton is 1250hp vertical, 1200rpm, rigid coupling. Motor shaft extension is 4.375" at the coupling seat. The design hub/shaft fit is 0.000-0.002" clearance.  There is also a key approx 1" square, 5" long.
 
During refurbishment, the motor repair shop identified the motor shaft was undersized and fretted where the coupling sat.
 
They propose to machine it down and bore a new coupling hub to match the shaft. However I'd prefer to avoid it because that would make the hub not interchangeable. Our routine maintenance practice involves swapping hubs among motors (we have a rotating spare motor, we remove a motor for refurbishment we immediately swap in a different newly-refurbished motor and transfer the hub to that, which keeps it matched to the pump hub).
 
I was thinking we might be able to address this in a similar way to how we address an undersized bearing seat. Machine down as needed for suitable weld/chrome thickness, build it up with welding or chrome plating and then machine back down to final dimension. If needed we could fill in the keyway and machine one 180 opposite, but I don't think that is necessary. Shop has reservations about how any surface repair would react to the stresses of transmitting torque. It doesn't seem like a problem to me since we have the key to assist with torque transmission and I believe that when working in conjunction with a key, the stresses would be primarily compressive at the fit rather than shear. For example with keyway at 12:00 driving clockwise, the trailing edge of the motor keyway at 11:30 may be pushing onto the key and the leading edge of the key at 12:30 is pushing onto the hub, which would require a distriburtion of compressive forces at the interface between 12:00 ccw around to 6:00 in order to produce counteracting force and moments on the hub to keep it in equilibrium position in the rotating reference frame. I realize that's not the whole picture since the key interacts in other ways with the hub (to maintain key in equilibrium position). I also realize the fit itself can transmit some torque by loading the fit in shear, but if gross spinning relative motion is limited by the key I wouldn't think it would be a problem. But then again I don't recall ever doing this repair before, so looking for other opinions
 
What do you think:
 
  • Can we get away with a surface repair such as chrome plating, flame spray, or weld buildup followed by machining to final size? (or do we need to go with custom hub dimension instead)?
  • If we do that surface repair, do we need to machine a keyway 180 or can it be done in a way to keep the keyway where it is?
Reply 0 0
Barry
Instead of investing on coating a shaft to spec, isn't easy and less risky to make/buy that coupling half now and make it a "unique pair with shaft D2" that you just swap, what prevents you to arrange this?
 
The coupling and shaft with D1 will go as a pair to next machine and so on
 I think this would be my choice if the powers to be agree.
Barry
Reply 0 0
electricpete
That is what shop proposed. It is not easier for us in terms of drawing changes and treating this motor and coupling differently than the others the next time it comes out which may be 10 years from now.
 
I understand all of these suggestions are trying to be helpful. We operate under a lot of constraints which I don't particularly expect anyone else to understand.  
Reply 0 0
Sledder2
EP,
You will always be able to get the coupling off if you make it tighter fitting on the shaft, no problem. The idea of filling the original keyway up and cutting another 180 deg. still makes no sense to me, that's way too much welding on a shaft if that's what they are proposing. I would stick to chroming the shaft to spec. and make your couplings tighter. It would be an improvement to you process you can document. I worked in a motor shop for years and have never heard of filling up a key way and cutting another one. That's just increasing the odds the shaft will break.
 
Thanks
Reply 0 0
electricpete
perhaps you can press the motor repair guys to present some formal documentation to show that a new keyway 180 opposite the original is a legitimate repair process?
No, they are the ones saying that would cause shaft weakness. They don't have any suitable option for building up a shaft with a keyway. The burden would be on me to justify it if I tell them to do that (and the only way they would do it with a new keyway 180 opposite)
could you get in contact with some other chrome repair providers and double check the implications of chroming and keeping the existing keyway?
Yes I am working on collecting opinions.
perhaps for the future you could have a new coupling prepared with a tighter fit and oil injection added to guarantee easy removal?
Not attractive option since it still requires design change and would increase complexity. We have a few critical pump applications with tapered shaft and hydraulic driveup, but no motor applications like that.
If you can establish exactly what the objectives of this control structure are,
There is no question what the objectives of the control structure are, but I'm not discussing them here. It is in part industry specific. I don't reveal my identity or my plant or industry on the public internet to the extent possible. That is why I'm not asking for help developing a strategy that falls within our constraints.   I have agreement with plant stakeholders on our strategy. Here on the forum the only thing I'm asking about is about options for building up the shaft, and that remains the only thing I'm interested in.
You will always be able to get the coupling off if you make it tighter fitting on the shaft, no problem.
Correct.  In some of our applications we need rapid heat application for removing tight hubs. The difficulty in physical work is not the main barrier to tightening the fit. It is the coordination of the change in approach, including drawing changes.
The idea of filling the original keyway up and cutting another 180 deg. still makes no sense to me, that's way too much welding on a shaft if that's what they are proposing.
The keyway would not be filled with weld buildup. See earlier comments.
 I would stick to chroming the shaft to spec.
That is actually my preferred solution. Can you describe how to chrome a shaft with a keyway and machine it to final dimension? It is routine for a bearing seat but apparently trickier for a shaft area with a keyway. I don't think you can do a final machine to spec on the shaft in the area of a keyway.
 
Reply 0 0
John from PA
No, they are the ones saying that would cause shaft weakness. They don't have any suitable option for building up a shaft with a keyway. The burden would be on me to justify it if I tell them to do that (and the only way they would do it with a new keyway 180 opposite)
 
 
Yes I am working on collecting opinions.
 
 
Not attractive option since it still requires design change and would increase complexity. We have a few critical pump applications with tapered shaft and hydraulic driveup, but no motor applications like that.
 
 
There is no question what the objectives of the control structure are, but I'm not discussing them here. It is in part industry specific. I don't reveal my identity or my plant or industry on the public internet to the extent possible. That is why I'm not asking for help developing a strategy that falls within our constraints.   I have agreement with plant stakeholders on our strategy. Here on the forum the only thing I'm asking about is about options for building up the shaft, and that remains the only thing I'm interested in.
 
 
Correct.  In some of our applications we need rapid heat application for removing tight hubs. The difficulty in physical work is not the main barrier to tightening the fit. It is the coordination of the change in approach, including drawing changes.
 
The keyway would not be filled with weld buildup. See earlier comments.
 
That is actually my preferred solution. Can you describe how to chrome a shaft with a keyway and machine it to final dimension? It is routine for a bearing seat but apparently trickier for a shaft area with a keyway. I don't think you can do a final machine to spec on the shaft in the area of a keyway.
 
Check for a PM I sent you.
Reply 0 0
electricpete
Sorry it wasn't my intention for you to discuss or reveal any of the reasons for the control structure.
No worries. I apologize if my tone was off... I was perhaps a little annoyed since I sensed a tone across many of the replies over the course of the thread that I was being judged. It's natural that people see what they perceive as a problem or a weakness and they want to solve it. For us, the 0-0.002" design clearance is simply not a problem that merits the effort to change it at this point in time.  
Reply 0 0
electricpete
Check for a PM I sent you.
Got it, thanks.
Reply 0 0
Sledder2
 
That is actually my preferred solution. Can you describe how to chrome a shaft with a keyway and machine it to final dimension? It is routine for a bearing seat but apparently trickier for a shaft area with a keyway. I don't think you can do a final machine to spec on the shaft in the area of a keyway.
 
 
 
In the shop I worked at had a chrome shop and we did a lot of shaft work when welding was not the best option. If I remember correctly, they would tape the keyway off so it it would not be affected. Once it is chromed it will be ground down to size.
Reply 0 0
HuskerTim
In the shop I worked at had a chrome shop and we did a lot of shaft work when welding was not the best option. If I remember correctly, they would tape the keyway off so it it would not be affected. Once it is chromed it will be ground down to size.
We had a brush plating system, our machinists would sometimes need to make custom anode/stylus as needed for their calculation, we had several on hand as time went by. Plating was done in a lathe with a cathode brush on the jaw chuck and the stylus held on the rotating part, the system was mounted on a cart and we would only keep small quantities of the solution in house to maintain a "small generator" waste facility status. It was selective plating and adjacent areas that didn't need build up were taped off. Finished with grinding as well.
Reply 0 0
Rusty Castleman
I don't believe this is a place where people are generally judgmental. I think we all speak from our own experiences, and what we have seen work (and not work) colors our perception of the solution to a problem, or what we individually "perceive" the problem to be. I am often guilty of responding when I've not read all the other responses, or maybe even the original post as well as I should have. Sometimes a thread of particular interest to the group sort of "blows up" and there is a lot written, and we need to take the time to read carefully. Also, if there are particular "restraints" surrounding a problem (we can't do this, or they won't consider that) it would help to state those as clearly and quickly as possible so we don't "flog a dead horse" so to speak.  
Reply 1 0
Rusty Castleman
Thanks @electricpete for moving this topic. I sometimes don't give enough attention to "housekeeping" on here.
Reply 0 0
electricpete
You do a good job Rusty. Thanks to you and the others who keep this place running so we can all learn from each other!
Reply 0 0
electricpete
The decision making on this shaft repair is still in progress. (Yes it has dragged out in time for a variety of reasons not exclusively related to the shaft repair... this is a spare motor without a near-term need in the plant... there is a period where repair shop collects various as-found information and feeds it to us and we discuss options before they finalize their repair proposal / cost... it's fine as long as we don't have an in-plant failure, in which case everyone would ask why it took so long).
 
Armed with some of the input from this thread I had some more discussions with the shop
  • They explained another reservation with re-using the existing key location is that they're not sure they could cut the new keyway exactly where the old keyway was, so we might end up with a wider keyway which would necessitate a step key (which is not particularly attractive to us).
  • We are going to revisit the keyway 180 degree opposite. I have a coupling drawing (drawn horizontally attached, but it's definitely vertical) which shows how much bigger the motor shaft is than the pump shaft. Namely a bigger shaft diameter, longer axial lenght of keyway. From a geometric standpoint the motor shaft is way more equipped to transmit torque. IF both shafts were made of the same material then we could easily say that the motor shaft has more than enough margin to accommodate the extra key 180-opposite. But I'm sure the pump shaft material has a higher yield strength... I'm going to poke around to see if I can find a basis for comparing strength of the shaft materials on the pump and motor.
Reply 0 0
Reply